Railway construction
Construction of Yuzhnoye electric train depot of the St Petersburg metro
- Region: St. Petersburg
- Budget: 6.6 billion rubles
- Period: 2014 – till present
- Client: St. Petersburg Government Contracts Committee
Construction of a Tommot-Kerdem branch line of the Amur-Yakutsk railway mainline
- Region: Sakha (Yakutia) Republic
- Budget: 14.79 billion rubles
- Period: 2005 – 2008
- Client: Russian Ministry of Transport, Federal Railway Transport Agency (Roszheldor)
- Region: Leningrad region, Vysotsk
- Budget: 2.8 billion rubles
- Period: 2003-2004
- Client: Lukoil Neftegasstroy
Construction of a connecting railway track at the Chinei integrated ore deposit (Novaya Chara-China)
- Region: Chita region
- Budget: 6.8 billion rubles
- Period: 1998–2001
- Client: RZHD OJSC
Construction of a connecting railway track to the Ulak-Elga coal field
- Region: Sakha (Yakutia) Republic
- Budget: 45 billion rubles
- Period: 2008–2011
- Client: Mechel OJSC
Construction of the Moscow monorail transport system
- Region: Moscow
- Budget: 3.3 billion rubles
- Period: 2001–2005
- Client: Moscow city government
Construction of the Berkakit-Tommot-Yakutsk railway line of the Amur-Yakutsk railway mainline
- Region: Sakha (Yakutia) Republic
- Period: 2005 – till present
- Client: Russian Ministry of Transport, Federal Railway Transport Agency (Roszheldor)